| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Timetabling and personnel planning Description
Further explanation of this example: 'Applications of optimization with Xpress-MP', Chapter 14: Timetabling and personnel planning
Source Files By clicking on a file name, a preview is opened at the bottom of this page.
Data Files
i5pplan.dat ! Data file for `i5pplan.mos' DUR: [1.3 0.9 2.0 0.3 0.9 1.8 1.7 1.4 0.6 1.1 1.3 1.2 1.3 1.0 1.4 0.9 1.1 1.0 0.9 1.0] TRANSF: [(1 2) 1 1 1 (2 3) 1 (2 5) 1 (3 1) 1 1 (3 4) 1 (4 5) 1 (5 1) 1 1 1] PROFIT: [7 8 9 7] CAP: [4500 5000 4500 1500 2500] TMAX: [ 400 800 200 500 300] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
© Copyright 2024 Fair Isaac Corporation. |