Project planning - Defining SOS Description Alternative formulations using either binary variables (Pplan) or SOS-1 (Pplan2)
Source Files By clicking on a file name, a preview is opened at the bottom of this page.
Pplan2.cpp // (c) 2024-2024 Fair Isaac Corporation /** * Project planning: Defining SOS1. A company has several projects that it must * undertake in the next few months. Each project lasts for a given time (its * duration) and uses up one resource as soon as it starts. The resource profile * is the amount of the resource that is used in the months following the start * of the project. For instance, project 1 uses up 3 units of resource in the * month it starts, 4 units in its second month, and 2 units in its last month. * The problem is to decide when to start each project, subject to not using * more of any resource in a given month than is available. The benefit from the * project only starts to accrue when the project has been completed, and then * it accrues at BEN[p] per month for project p, up to the end of the time * horizon. */ #include <iostream> #include <xpress.hpp> using namespace xpress; using namespace xpress::objects; using xpress::objects::utils::sum; std::vector<std::string> const PROJ{"A", "B", "C"}; /* Set of projects */ int const NM = 6; /* Time horizon (months) */ std::vector<int> const MONTHS{ 1, 2, 3, 4, 5, 6}; /* Set of time periods (months) to plan for */ std::vector<int> const DUR{3, 3, 4}; /* Duration of project p */ std::vector<int> const RESMAX{5, 6, 7, 7, 6, 6}; /* Resource available in month m */ std::vector<double> const BEN{ 10.2, 12.3, 11.2}; /* Benefit per month once project finished */ std::vector<std::vector<int>> const RESUSE{ /* Res. usage of proj. p in its t'th month */ std::vector<int>{3, 4, 2, 0, 0, 0}, std::vector<int>{4, 1, 5, 0, 0, 0}, std::vector<int>{3, 2, 1, 2, 0, 0}}; int main() { XpressProblem prob; // Create the decision variables // 1 if proj p starts in month m, else 0 auto start = prob.addVariables(PROJ.size(), NM) .withName([](auto p, auto m) { return "start" + PROJ[p] + ", " + std::to_string(MONTHS[m]); }) .toArray(); // Each project starts once and only once prob.addConstraints(PROJ.size(), [&](auto p) { return sum(start[p]) == 1; }); // Resource availability. A project starting in month m is in its k-m month in // month k: // sum(p in PROJ, m in 0..k) RESUSE(p,k-m)*start(p,m) <= RESMAX(k) prob.addConstraints(NM, [&](auto k) { return sum(PROJ.size(), k + 1, [&](auto p, auto m) { return start[p][m] * RESUSE[p][k - m]; }) <= RESMAX[k]; }); // Define SOS-1 sets that ensure that at most one start(p,m) is non-zero for // each project p. Use month index to order the variables prob.addConstraints(PROJ.size(), [&](auto p) { return SOS::sos1(start[p], nullptr, "sos" + std::to_string(p)); }); // Objective: Maximize Benefit If project p starts in month m, it finishes in // month m+DUR[p]-1 and contributes a benefit of BEN[p] for the remaining // NM-[m+DUR[p]-1] months: LinExpression obj = LinExpression::create(); for (unsigned p = 0; p < PROJ.size(); p++) { for (int m = 0; m < NM - DUR[p]; m++) { obj.addTerm(start[p][m], BEN[p] * (NM - m - DUR[p])); } } prob.setObjective(obj, ObjSense::Maximize); // Solve the problem prob.optimize(); std::cout << "Problem status: " << to_string(prob.attributes.getMipStatus()) << std::endl; ; if (prob.attributes.getMipStatus() != MIPStatus::Solution && prob.attributes.getMipStatus() != MIPStatus::Optimal) throw std::runtime_error("optimization failed with status " + to_string(prob.attributes.getMipStatus())); // Solution printing std::cout << "Solution value is: " << prob.attributes.getObjVal() << std::endl; auto sol = prob.getSolution(); for (unsigned p = 0; p < PROJ.size(); p++) for (int m = 0; m < NM; m++) { if (start[p][m].getValue(sol) > 0.5) std::cout << "Project " << PROJ[p] << " starts in month " << MONTHS[m] << std::endl; } return 0; }
| |||||||||||||||
© Copyright 2025 Fair Isaac Corporation. |