Scheduling problems

Description
Problem name and type, featuresDifficultyRelated examples
B‑1 Construction of a stadium: Project scheduling (Method of Potentials) *** projplan_graph.mos
2 problems; selection with `|', sparse/dense format, naming and redefining constraints, subroutine: procedure for solution printing, forward declaration, array of set
B‑2 Flow shop scheduling **** flowshop_graph.mos
alternative formulation using SOS1
B‑3 Job shop scheduling *** jobshop_graph.mos
formulating disjunctions (BigM); dynamic array, range, exists, forall-do,array of set, array of list
B‑4 Sequencing jobs on a bottleneck machine: Single machine scheduling *** sequencing_graph.mos
3 different objectives; subroutine: procedure for solution printing, localsetparam, if-then
B‑5 Paint production: Asymmetric Traveling Salesman Problem (TSP) ***
solution printing, repeat-until, cast to integer, selection with `|', round
B‑6 Assembly line balancing ** linebal_graph.mos
encoding of arcs, range


Further explanation of this example: 'Applications of optimization with Xpress-MP', Chapter 7: Scheduling problems

mosel_app_2.zip[download all files]

Source Files

Data Files





b1stadium2.dat

! Data file for `b1stadium2.mos'

SUCC: [(1) [2]
       (2) [3, 4, 14]
       (3) [5]
       (4) [6, 7, 9, 10, 15]
       (5) [6]
       (6) [8, 9, 11]
       (7) [13]
       (8) [16]
       (9) [12]
      (10) [19]
      (11) [16]
      (12) [17]
      (13) [19]
      (14) [15, 16]
      (15) [19]
      (16) [19]
      (17) [18]
      (18) [19] ]
     
COST: [0 30 26 12 17 15  8  0 42 21 18  0  0 22 12  6 16  0  0]

DUR:  [2 16  9  8 10  6  2  2  9  5  3  2  1  7  4  3  9  1  0]

MAXW: [0  3  1  2  2  1  1  0  2  1  1  0  0  2  2  1  3  0  0]

BONUS: 30